4 storey Office Refurbishment -South London

  • Jo Bacon

This project covered RIBA stage 6- Construction Phase. I did weekly site visits and attended client meetings . Dealing directly with the contractor and producing material and product specification. Vector works was used to compile final detailed drawings for the bathrooms, ceiling and tiling layouts which were then built on site within the 5 months I worked on this project. SKILLS LEARNT : Working on a construction site-,coordination and collaboration with contractors and workers. Seeing drawn details physically built.